Your new Paris office, furnished by the day you move in

Office moves slip on one late order. We build the furniture schedule backwards from your move-in date, order long-lead pieces first and fit delivery into the programme of the contractors you appoint for the works.

  • Lead times confirmed in writing by each maker in its order acknowledgement.
  • One schedule and one contact for all furniture makers.
  • Meetings in English, in Levallois-Perret, by video call or on site.
  • Brief answered within two working days in most cases.

Book a first call about your move

Soul Design (SAS, Levallois-Perret) uses this information to answer your request, get back to you and, if you wish, prepare a quote. It is kept for 3 years after our last exchange if no project is signed. To access, correct or delete it, write to paul@maisonsouldesign.fr. Details in our privacy policy.

Work backwards from the keys

European makers announce lead times of several weeks, sometimes several months for upholstered or made-to-order pieces, and the French summer break and the end-of-year closures stretch them further. A furniture programme for a new office therefore starts as soon as the lease is signed, not when the works are finished.

We draw up a retro-schedule with three dates for each family of furniture: the latest order date, the maker’s confirmed shipping date and the delivery slot on site. Pieces with the longest lead time, such as a boardroom table, reception desk or bespoke banquettes, are designed and ordered first. Task chairs and storage, usually quicker, follow once the layout is frozen.

Furniture fitted into the works programme, not into the works

Soul Design does not sell or carry out building works. Partitions, flooring, electrical work and fixed joinery are contracted directly between you, or your landlord, and the companies concerned, under their own insurance. If you have no contractor yet, we can recommend some.

What we take on is the interface. Desk positions are given to the electrical contractor in time to place floor boxes; wall-mounted screens and heavy tables are flagged to whoever builds the partitions; the delivery slot is booked after cleaning and before staff arrive. A missed floor box under a meeting table is easy to avoid on a plan and expensive to fix after the carpet is laid.

Paris logistics: the details that decide the delivery

Paris buildings have their own constraints: narrow streets, loading bays shared with neighbours, lifts sized for people rather than for a 3.60 m tabletop, Haussmann-era staircases and building managers who require a booked slot and floor protection. We check access during the site visit and specify pieces that can be delivered: tables with removable legs, sofas in modules, worktops in sections.

Delivery and installation are carried out by partner installers who unpack, assemble, position each piece on the plan and take the packaging away. For occupied buildings, deliveries can be grouped early in the morning or at weekends, subject to the building’s rules.

  • lift and stair dimensions checked against each large piece
  • parking or delivery permit requested where needed
  • floor and wall protection along the route
  • packaging removed on the day

French rules international teams ask about

If part of your office receives the public, such as a reception or training room, it may fall under French fire safety rules for buildings open to the public (ERP), and some furniture will need test reports from the maker. Your fit-out architect or inspection body sets the requirement; we collect the documents and add them to the handover file.

For workstations, the French benchmark NF X35-102 recommends at least 10 m² per person in an office. It is not a legal minimum, but occupational health services refer to it. VAT is charged at the French standard rate on furniture delivered in France to a company; quotes are issued excluding VAT with the rate shown.

Typical cases

Typical case

A US company opening a 30-person Paris office

Situation
The lease starts in three months, the fit-out contractor is chosen, and the head office wants its global furniture standard respected.
Our approach
We would map the global standard to European equivalents with comparable documentation, order the reception and meeting room pieces in week one, and lock the delivery slot with the contractor’s handover date.

Typical case

A firm moving its headquarters within Greater Paris

Situation
Some existing furniture is worth keeping, the rest is not, and both moves must happen over one weekend.
Our approach
We would inventory what moves, what is taken back for reuse and what is new, and schedule new deliveries after the removal company has placed the existing pieces.

Typical case: a representative situation, not a completed project.

What shapes the budget of a new office

The quote follows the layout and the schedule. These items carry most of the variation.

ItemWhat drives it
Workstations and chairsnumber of people, fixed or sit-stand desks, chair range
Meeting rooms and boardroomnumber and size of rooms, catalogue or bespoke table, video integration
Reception and client areasreception desk design, lounge seating, materials
Storage and lockersassigned or shared desks, archive needs
Design, logistics and installationfloor area, Paris access, out-of-hours slots, number of deliveries

We quote line by line, with maker, origin and announced lead time on each line. Professional clients can spread the cost through a finance lease over 24 to 60 months, subject to approval by the finance partner.

How we work

  1. 01

    Lease and plan review

    Floor plan, headcount, move-in date and the contractors already appointed.

  2. 02

    Test fit and retro-schedule

    Layout scenarios and an order calendar with the latest date for each furniture family.

  3. 03

    Selection and quote

    Pieces from European makers, samples, documentation and a line-by-line quote.

  4. 04

    Orders and tracking

    Each maker’s order acknowledgement checked and shared, with alerts if a date moves.

  5. 05

    Delivery, installation, handover

    Booked slot, installation on plan, packaging removed, snag list and documentation file.

Frequently asked questions

How early should we start the furniture?

As soon as the lease is signed. Bespoke and upholstered pieces can need several months; starting early lets us order them before the layout of open areas is even final.

Can you work with our fit-out contractor?

Yes. We share furniture positions, loads and delivery needs with them and align our dates with their handover. They contract with you directly for the works.

Can we follow our global furniture standard?

Yes. We propose European pieces that match its specification and documentation, and flag any item where lead time or French rules suggest an alternative.

Do you deliver outside Paris?

We deliver and install across the Île-de-France region; projects further afield are studied case by case.

What happens to our old furniture?

Pieces in good condition can be moved, reused or taken back through our second-life service; the rest is handled through the furniture recycling scheme.

Who signs off fire documentation?

Your inspection body or fit-out architect sets the requirement. We gather the makers’ test reports for the pieces concerned and include them in the handover file.